Long Lead Option
Showing 1–18 of 69 resultsSorted by latest

PN: G15CP6X2PS-S
Maximum Capacity (lbs)
1200 lbs
Fastening Type
Swivel Plate
Wheel Type
Polyurethane on Aluminum
Overall Height
7-1/2"
Wheel Width
2"
Wheel Diameter
6"
Wheel Bearing
Precision Sealed Ball Bearings
$169.84

PN: G15CP8X2PS-S
Maximum Capacity (lbs)
1500 lbs
Fastening Type
Swivel Plate
Wheel Type
Polyurethane on Aluminum
Overall Height
9-1/2"
Wheel Width
2"
Wheel Diameter
8"
Wheel Bearing
Precision Sealed Ball Bearings
$190.34

PN: G15DS6X2BRNZ-S
Maximum Capacity (lbs)
1500 lbs
Fastening Type
Swivel Plate
Wheel Type
Ductile Steel
Overall Height
7-1/2"
Wheel Width
2"
Wheel Diameter
6"
Wheel Bearing
Bronze (High Temp)
$161.05

PN: G15DSC8X2BRNZ-S
Maximum Capacity (lbs)
1500 lbs
Fastening Type
Swivel Plate
Wheel Type
Ductile Steel
Overall Height
9-1/2"
Wheel Width
2"
Wheel Diameter
8"
Wheel Bearing
Bronze (High Temp)
$175.70

PN: G15EN6X2PS-S
Maximum Capacity (lbs)
400 lbs
Fastening Type
Swivel Plate
Wheel Type
Neoprene
Overall Height
7-1/2"
Wheel Width
2"
Wheel Diameter
6"
Wheel Bearing
Precision Sealed Ball Bearings
$125.91

PN: G15EN8X2PS-S
Maximum Capacity (lbs)
500 lbs
Fastening Type
Swivel Plate
Wheel Type
Neoprene
Overall Height
9-1/2"
Wheel Width
2"
Wheel Diameter
8"
Wheel Bearing
Precision Sealed Ball Bearings
$172.78

PN: G15HU6X2-S
Maximum Capacity (lbs)
1700 lbs
Fastening Type
Swivel Plate
Wheel Type
Polyurethane
Overall Height
7-1/2"
Wheel Width
2"
Wheel Diameter
6"
Wheel Bearing
Precision Sealed Ball Bearings
$108.35

PN: G15HU8X2-S
Maximum Capacity (lbs)
2000 lbs
Fastening Type
Swivel Plate
Wheel Type
Polyurethane
Overall Height
9-1/2"
Wheel Width
2"
Wheel Diameter
8"
Wheel Bearing
Precision Sealed Ball Bearings





























